Posted by on May 14, 2025 — Updated on June 12, 2025
This guide will walk you through the process of deprioritizing a package from being assigned to existing visits.
Click the Schedule tab to reveal the additional options beneath it.
Click on the packages tab.
Locate a package and click the edit icon.
Scroll down, go to advanced settings and select the “Deprioritize Package” checkbox. If enabled, this package will be deprioritized when applying to visits and package limit restrictions.
Click the save package button to save the changes made to the package.
The guide demonstrated how to deprioritize a package.